How to maintain the production capacity of jaw crusher? What is the installation procedure of the jaw crusher?

Jaw crusher can produce granite, dolomite, bluestone, quartzite, iron ore and other stones with a compressive strength of no more than 320. The processed finished product has a uniform grain shape, which is favored by many users.  

How to maintain the production capacity of jaw crusher?

1. Control environment variables: When it running, pay attention to the temperature of the motor they are equipped with. If the temperature is too high, it will damage the motor;

2. Feeding uniform amount and constant speed: Continuous feeding at the same amount and speed will maintain the healthy operation of the machine and greatly promote its work efficiency;

3. The belt tension is appropriate: To maintain the appropriate transmission belt tension, do a good job in the drive maintenance, to avoid belt slippage, speed reduction, etc., can help increase the production capacity, while reducing energy consumption.

4. Operate the equipment correctly: To ensure that the equipment can produce "continuous output" with high output, the operator must ensure that the equipment is accurately controlled, as far as possible to guide the feeding point to the center of the machine's inlet, which can improve efficiency.



What is the installation procedure of the jaw crusher?

1. Assembling the jaw crusher requires the installation of the main crushing plate, which must be firmly attached to the jaw plate, using soft metal as a gasket to ensure the leveling and then tightening with bolts. During the working process of the stone crusher, regularly check whether the crushing plate is loose. If so, adjust it in time to prevent breakage or wear, so as to reduce the service life of the crushing plate.

2. The jaw crusher is used for crushing hard and large raw materials. It is normal for strong vibration to occur during work, and the reinforced concrete structure is stable. After operation, if there are signs of cracks and looseness, adjust it in time to avoid adverse effects on safe operation.

3. If you ignore the loose nut of the crusher, the wear of the crushing plate will increase, and then noise will be generated. In severe cases, the crushing plate will fall off or break and the equipment will stop, affecting normal production. This requires checking whether the bolts and nuts are tight before starting the machine to solve this problem.